Monticello Temple
ABOUT THIS PROJECT
This project included demolition of existing portions of the building with a major remodel of the existing spaces and additions added to the building in three locations which nearly doubled the size of the building.This remodel included protection of minor existing spaces with complete repainting, wall coverings and new carpeting being installed throughout the new and remodeled structure. The existing locker rooms were re-configured and enlarged with all new finishes and equipment being installed. The floor, ceiling and wall coverings throughout were removed and re-installed. The mechanical system received a complete upgrade and additional work performed at required areas. The existing boiler was large enough to heat the new spaces, but new condensing units were required to cool the new areas. Air handlers and new ductwork was also added to serve the new areas. Humidifiers were added the entire system, and the controls for the entire system were upgraded. The electrical upgrade included a new service feed to the building. A new main distribution panel and four sub-panels were added. There is an extensive Audio Visual system throughout the building. New chandelier and hoists were added. Metal studs with gypsum board. Gold leaf decorative painting. Carpet carving/sculpting. All existing stained glass windows were removed and re-installed. The addition portions of the project included three assembly rooms, waiting room, laundry facility, several restrooms and several offices. The building footings were built on 24″ of imported structural fill. It was a wood framed building with a trussed roof system. The exterior finish consisted of a 12″ X 12″ marble tile adhered to and aluminum clad plywood sheathing. The grout joints were caulked with a specialized caulking material. The roof was a single ply EPDM membrane over ½” fiber board. The site work included relocation of an existing wrought iron fence with additional new fencing being installed up to the new property line. We added 7′ high retaining walls and new landscape area’s to the site. Specialty items on this project included adding a new water well with a 12,000 gallon concrete holding tank to provide irrigation water to the site, ADA upgrades, A/V system, marble work, gold leaf painting and high level specialty finishes. The job was completed within the scheduled seven month time period and was completed with in the Owners budget.
Monticello, Utah
LOCATION
The Church of Jesus Christ of Latter-day Saints
CLIENT/OWNER
11,000 sf
SIZE
Brower and Associates
ARCHITECT
Previous
Next
Monticello, Utah
LOCATION
The Church of Jesus Christ of Latter-day Saints
CLIENT/OWNER
11,000 sf
SIZE
Brower and Associates
ARCHITECT
Project Gallery
SIMILAR PROJECTS
Cabo Verde Temple
The Praia Cape Verde Temple becomes the Church’s 173rd temple, dedicated just five weeks after the Yigo...
Church History Museum
Located directly west of Temple Square at 45 N. West Temple in downtown Salt Lake City, this museum...
Fiji Temple
Westland Construction completed the renovation of the LDS Temple in Suva Fiji in December. Originally dedicated in...
Haiti Temple
The Port-au-Prince Haiti Temple is the first built in the country and the second built in the...
Hamilton NZ Temple
Originally dedicated in April of 1956, the Hamilton New Zealand Temple was the first temple built by...
Kinshasa Democratic Republic of Congo Temple
Orem Utah Temple
Located between the Wasatch Mountains and the shores of Utah Lake, the Orem Utah Temple has a perfect location on a site ...
St George Temple
The oldest operating temple for the Church of Jesus Christ of Latter-day Saints recently completed a major...