Mountain Point MOB Tenant Improvement

by Westland Construction on July 10, 2015 Comments Off on Mountain Point MOB Tenant Improvement

Description

The Mountain Point Medical Office Building (MOB) is an up-scale, modern medical services facility attached to the 28-acre campus of the IASIS Mountain Point Medical Center. The facility provides Northern Utah County with primary care and multi-specialty physician groups. This project was successfully delivered on a fast-track construction time-frame of 4 ½ months.

The MOB is a 3-level steel structure that provides over 42,000 sf of medical office space, including medical workspaces, hospital lab space, X-ray exam, casting room, procedure rooms, 24+ exam rooms, and a vacuum tube system for moving medical samples to and from the main hospital. The scope of work entailed the tenant-improvements for 10 distinct medical practices. The interior is metal-stud framed, with painted drywall, premium carpet, tile, and laminate flooring. Quartz, marble, and upscale, solid surfaces throughout.

Architect

Dixon Architecture

Project Size

3 Levels totaling 42,000 SF

Owner

IASIS Healthcare

Use

Healthcare

read more
Westland ConstructionMountain Point MOB Tenant Improvement

IHC Ephraim Clinic

by Westland Admin on February 16, 2015 Comments Off on IHC Ephraim Clinic

Description

New construction of healthcare clinic

Architect

Nelson Howden & Associates

Project Size

Owner

Intermountain Health Care, Inc.

Use

Healthcare

read more
Westland AdminIHC Ephraim Clinic

Young Family Dental – Orem

by Westland Admin on February 15, 2015 Comments Off on Young Family Dental – Orem

Description

This project is a great example of a complete refurbishment and reconfiguration of an aging, existing structure and transforming it into a fresh, usable medical space. The first level is configured for a parking structure, while the upper level is modern professional office space.

Architect

Greg Steffensen

Project Size

5,700 SF

Owner

Dr. Wayne B. Young

Use

Healthcare

read more
Westland AdminYoung Family Dental – Orem

IHC Saratoga Springs Clinic

by Westland Admin on February 15, 2015 Comments Off on IHC Saratoga Springs Clinic

Description

9,500 SF medical clinic sitting on approximately 5 acres of developed property. This project included the development of a new private drive, an extension to a new city street and work along the UDOT highway. The construction included stone and brick facades over metal and wood stud framing. The main entrance is structural steel with storefront windows and metal wall panels. The project houses x-ray scanning equipment that requires lead lined drywall, doors and windows. The facility is designed for future expansion and will serve as one of the primary medical facilities in the area.

Architect

HKS Architects, Inc.

Project Size

9,500 SF

Owner

Intermountain Health Care, Inc.

Use

Healthcare

read more
Westland AdminIHC Saratoga Springs Clinic

Revere Health Clinic – Salem Campus

by Westland Admin on February 15, 2015 Comments Off on Revere Health Clinic – Salem Campus

Description

Located in Salem, Utah this 100,000 SF Medical Office Building offers Primary, Specialty, and Urgent Care services, including: dialysis, imaging, gastroenterology, neurosurgery, urological surgery, pediatrics, outpatient lab, orthopedics, internal psych, and behavioral health services.

This new Multi-Specialty Health Center has a full-service pharmacy, physical therapy, large conference rooms with amenities suitable for banquets, seminars and educational trainings. The campus also features an overnight, extended care facility with 16 beds. Efficiency is enhance with self-check-in kiosks to reduce wait time and increase patient privacy.

Architect

Dixon & Associates

Project Size

100,000 sq. ft.

Owner

Revere Health

Use

Healthcare

read more
Westland AdminRevere Health Clinic – Salem Campus

Portland VA Medical Center Remodel

by Westland Admin on September 20, 2014 Comments Off on Portland VA Medical Center Remodel

Description

This was a design/build project located at the Portland VA Medical Center. The project consisted of resolving the Patient Privacy and Accessibility deficiencies in the 120 Bed NSCU at the Vancouver Campus of the Portland VA Medical Center. The main corrections were to convert the six, 4-bedrooms into 12, 2-bedrooms, add privacy to the existing congregate baths, add showers to existing bedroom toilet rooms, correct the accessibility of the patient bathrooms, and add grab bars on both sides of the toilet; one of which is folding.

Architect

Mesa Consulting Group

Project Size

2,800 SF

Owner

Vancouver VA Medical

Use

Healthcare

read more
Westland AdminPortland VA Medical Center Remodel

Parkway Health Center

by Westland Admin on September 19, 2014 Comments Off on Parkway Health Center

Description

Wood framed skilled nursing facility. This is a forty-six room, seventy-two bed facility. The exterior walls are EIFS and stone. All building entrances are furnished with extensive timber work. This project has a full commercial kitchen and large skilled nurse stations. This project was originally scheduled to be completed in 12 months, but when the owners came to us and expressed interest in accelerating the schedule, we agreed to push as hard as we could. With proper management and close coordination with the subcontractors, we were able to bring this project in ahead of schedule by over a month.

Architect

Carpenter Stringham

Project Size

35,000 sq. ft.

Owner

Parkway Health Center

Use

Healthcare

read more
Westland AdminParkway Health Center

UVRMC Boiler Plant & Grounds Building

by Westland Admin on September 19, 2014 Comments Off on UVRMC Boiler Plant & Grounds Building

Description

This project comprised the demolition of the existing grounds building & the construction of a new, 3200 SF maintenance facility. The existing maintenance shop site was reconfigured for a new boiler plant to serve the existing IHC Provo campus. State of the art, energy efficient heating equipment was installed that increased the capacity of the plant.

The new construction involved structural coordination with the existing service tunnel that runs under the new building, with the unusual challenges of relocation of existing main and auxiliary power sources, as well as the existing oxygen supply system, main water service, facility communications and fuel supplies, all without compromising the 24/7 functionality of the 4th largest operating hospital in the State of Utah. A well-coordinated design and construction team managed this project to successfully meet key delivery dates and cost parameters.

Architect

Van Boerum & Frank

Project Size

3,200 SF

Owner

Intermountain Health Care

Use

Healthcare

read more
Westland AdminUVRMC Boiler Plant & Grounds Building