Description
Major renovation of an existing, 80-yr old structure built in the 1930’s, now functioning as a Jr. High School. Construction took place over the 2002 summer break. Schedule was paramount, with students expected back for the start of the new school year in the fall. Work included replacement of the window systems and extensive remodel of the interior.
Architect
Project Size
10,000 SF
Owner
Carbon School District
Use
Education