Western Metals Recycling Expansion
ABOUT THIS PROJECT
Non-ferrous facility where all types of metals are received, weighed and prepared for recycling. The project consists of a 17,000 sf metal siding warehouse. The warehouse has 6’ high exterior exposed architectural concrete walls. Attached to the warehouse is a 6,500 sf two story office building. The project sits on 5 acres of developed site consisting of a large on-site water retention pond with ample truck and vehicle parking. Detached from the warehouse and office are three large truck scales for weighing of delivered material. The weighing of material is done through a centrally located detached 625 sf Scale Clerk Building. Also detached from the main operation center are two kiosk buildings for payment and an in-bound vehicle metals inspection station.
Salt Lake City, Utah
LOCATION
Western Metals
CLIENT/OWNER
23,500 sf
SIZE
Brixon & Christopher
ARCHITECT
Previous
Next
Salt Lake City, Utah
LOCATION
Western Metals
CLIENT/OWNER
23,500 sf
SIZE
Brixon & Christopher
ARCHITECT
Project Gallery
SIMILAR PROJECTS
Jiffy Lube
Construct new 4,100 sf – 3 bay lube facility including complete site, retaining walls, concrete, asphalt elements; 1,500 s.f...
Rocky Mountain ATV
Single level of 100,000 sq. feet. Walls were 36′ tall allowing for 30 feet of open vertical area for future...
SupraNaturals
Contract manufacturing facility for the nutraceutical industry. This facility manufactures tablet, capsule, and pill form dietary...
Western Metals Recycling
$4.1 Million, 45,180 sq. ft. recycling facility consisting of three separate buildings for office and warehouse, built of...