Westland Construction expanded and remodeled Balance of Nature’s newly acquired production facility in Hurricane, Utah, with Orcutt Winslow as architect. The completed facility totals about 143,500 square feet and houses Balance of Nature’s production, storage and shipping operations, along with new office space. Phase 1 upgraded the existing fire sprinkler system and power infrastructure and added interior production and packaging areas. Phase 2 added a 70,000-square-foot tilt-up expansion with state-of-the-art automated racking and storage systems. That phase also required extensive site excavation, including mass over-excavation and new retention and storm water collection systems. Construction began in March 2023 and reached substantial completion in late 2025, giving Balance of Nature room to grow its operations in southern Utah.